WB Johnston

Shattuck, OK

Project added truck and rail unloading and loadout capability, in conjunction with (3) 550,000 bushel capacity jump form concrete bins. 25,000 BPH truck receiving pit and 50,000 BPH rail shuttle receiving pit. Machinery catwalks allow access to bins and 25,000 BPH transfer conveyors from tower. Each hopper bottom bin utilizes a 50,000 BPH side draw spout for primary bin unloading, and then a 7,500 BPH auger with telescoping head section for final bin cleanout.